3/15/11 -- I've put the two-piece, 20' Twilight "on hold." (I want to be sure to have the skiff completed for rowing by grandkids this summer.) The photo is deceiving; the far end looks shorter than the near end. Both sections are 10' in length.

Here's the Bevin's center frame:

The 'glas on frame's "chine joint" before wetting-out:

I 'glassed and wet-out both sides of both joints. Left in clamps with waxed paper on all 4 "sides." Shop was 55 degrees when I left. Used excess epoxy to coat forward side (inside) of transom. I'll see how it sets up when I return in about a week. Headed for "Don's Lie and Brag" event in AZ. See my home page for a link.

NEXT PAGE

(Bevin's Skiff)
HOME PAGE