3/30/11 -- The Byrnes Mill police chief stopped by for a long chat, so did not get much accomplished.

Here's the fair curve I described.

The transom is screwed in place, but the frame is only clamped. Something wrong with height of transom, or height of sides. Whatever, it'll be an easy fix. Maybe I'll get it stuck together tomorrow.
Wired up a heated box to keep epoxy ready for use epoxy. (More later.)

New parts have not arrived for carb, and the first cruise of the season is Friday. I'll go if I get SOUPER running and leak stopped.

Left some heat on that "green" (not fully cured) epoxy at stem:

NEXT PAGE

(Bevin's Skiff)
HOME PAGE